Construction Owners False Sense of a Good Price

Are You Looking At Only The Bottom Line? 

Share 


Construction Project Management category interest

If an owner is given five prices for the same project they typically choose the mid-level price without descoping the proposals to qualify that they are inclusive of all shown on drawings and the scope of work. This is where price vs. quality comes in and Owners would rather take the middle of the road rather than staying in the fast lane and choosing a well qualified bid due to the sticker shock factor.

So build your relationships, take the time to see the entire picture not just the drawings given to you, and lastly be sure that the owner has all the variable that could or could not happen after the bid is presented! 

More Photos

Share 

More from Construction Project Management

The Well Qualified Proposal
Construction Project Management

The Well Qualified Proposal

Would a Mercedes be a Mercedes if it cost half as much — or — would it cease to be a luxury vehicle? 

A Qualified Lead
Construction Project Management

A Qualified Lead

A lead or sales lead is defined by Wikipedia as ‘the identification of a person or entity that has the interest and authority to purchase a product or service’.

Sign up for ProjectSuite365 Newsletters

Keep in touch with everything on ProjectSuite365. Sign up for our newsletter!
 







Stats
Elapsed time: 0.3898 seconds
Memory useage: 2.73MB
V2.geronimo